An interesting article in Government Computing News (GCN), Comatose servers draining data center efficiency, points out the fact that there is still a great deal of waste when it comes to unused server power in the data center. According to the article, a new study by IT consulting firm Anthesis Group working with Stanford University supports earlier findings from the Uptime Institute as well as much of the anecdotal evidence we've heard from some of our clients:

30 percent of physical servers are lying comatose in corporate data centers

Call them "zombie servers", call them "comatose", they are costing corporations billions in energy usage. As we pointed out a while ago the NRDC estimated that as many as a full one-third of organizational servers are drawing power but are no longer in use by the organization for any production. Making matters worse, a single watt of power drawn at the server is estimated to consume 2.2 watts total between the server itself, transmission losses, and cooling requirements. Finally, older servers (those most likely to be dormant) were inherently less energy efficient at idle. The end result is nearly 40% of all data center energy usage is simply waste.

In GCN, writer Kathleen Hickey says that researchers have come up with two solutions for unused computing systems when it comes to government data centers. The first is to use distributed computing to eliminate the need for separate computers for different tasks. The second is to turn servers on and off depending on capacity needs.

Of course, that depends on being able to locate the individual servers in the first place, and as we've said before, that is often the biggest challenge. I think that the most viable third option, which can work with either or both of the previous options, is to tag and track data center assets throughout their life-cycles.

RFID tracking is now being leveraged by many data center operations teams to manage assets and automate the previous manual process leading to increased accuracy and productivity. It takes 10 percent of the time to perform an inventory audit using RFID technology that it used to take with manual processes.

Sean Cotter is President of Asset Vue, bringing 27 years of experience in IT leadership, business development, and entrepreneurship. He leads the company’s strategic direction and team, helping organizations simplify inventory management through RFID and barcode technology, automated data capture, and asset lifecycle tracking.

Sean’s expertise spans RFID and automatic identification technologies, process optimization, data center infrastructure management, and environmental monitoring. Before Asset Vue, he founded and grew an outsourced IT business and later served as Director of IT and CIO at the DVL Group. He has also taught Operations Management as an Adjunct Professor at West Chester University and holds a master’s degree in business from Saint Joseph’s University’s Haub School of Business.

His writing draws on this operational and technology experience to explore practical approaches to asset visibility, inventory accuracy, and more efficient IT asset management.

Recent Blogs

Understanding Inventory Drift in Hardware Asset Management
Oct 14, 2026 . 7 min Read
Understanding Inventory Drift in Hardware Asset Management
Read More
What Breaks IT Asset Inventory Accuracy
Oct 12, 2026 . 6 min Read
What Breaks IT Asset Inventory Accuracy
Read More
Why University RFID Rack Reads Become Inconsistent
Oct 10, 2026 . 6 min Read
Why University RFID Rack Reads Become Inconsistent
Read More